Hilton Head Christian Academy Upper School
Facility: K-12 Education
Type: New Construction
Area: 16,500 SF
Location: 3082 Bluffton Parkway, Bluffton, SC 29910
Opened / completed: Ribbon cutting March 19, 2025
Owner / Client: Hilton Head Christian Academy
Architect: Court Atkins Group
Construction cost: $7.8 million (school-reported)
General Contractor: Choate Construction
Method’s scope: Mechanical, electrical, plumbing, and fire protection engineering
Overview
The Hilton Head Christian Academy Upper School is a new 16,500 SF, two-story academic building on the school’s 27-acre campus at 3082 Bluffton Parkway in Bluffton, South Carolina. It serves grades 9 through 12 and was designed by Court Atkins Group and built by Choate Construction. Construction began after an April 2024 groundbreaking, and the school held a ribbon-cutting on March 19, 2025, ahead of schedule.
The building has flexible, collaborative learning spaces, a science lab, an indoor/outdoor visual arts studio and a second campus cafe with a courtyard. A student commons with an outdoor learning porch and a grand staircase overlooks the center of campus. The $7.8 million project was funded by private donations through the school’s Created to Soar capital campaign. Method Engineering Group provided mechanical, electrical, plumbing and fire protection engineering.