Mechanical (HVAC) Engineering for Buildings in Savannah and the Southeast
Method Engineering Group designs the heating, cooling and ventilation systems that keep buildings comfortable, safe and efficient. Our mechanical team is led by Andrew McKeever, PE, who is also a principal of the firm. We work directly with architects, contractors and building owners on new construction and renovation, from a 1,000 SF restaurant expansion to a 147,000 SF, 14-story residence hall.
We design every project in Autodesk Revit, so ductwork, piping and equipment are coordinated with the architecture and the other trades before anything is built. That matters most in tight spaces, such as a masonry building from about 1856 that needed commercial kitchen ventilation or a historic tower that had to hide its cooling equipment next door.
What's included
HVAC load calculations and system selection (heating, cooling and ventilation)
Air distribution: ductwork, air handling and rooftop or split systems, diffusers and exhaust
Variable refrigerant flow (VRF), including water-source VRF, and heat recovery
Hydronic piping and central plants (chilled water, hot water and cooling towers)
Commercial kitchen ventilation: Type I hoods, makeup air and demand-controlled kitchen ventilation
Building automation and controls
Energy code and ventilation code compliance, with energy modeling when a project needs it
Revit coordination, submittal and RFI review, and construction-phase support
Project types we design these systems for
K-12 schools, higher education, hotels and hospitality, multifamily and student housing, restaurants and commercial kitchens, recreation centers, offices, government buildings, and historic renovations.
Featured projects
Chatham House Residence Hall: Mechanical engineer of record for a 147,000 SF historic residence hall. Paired a water-source VRF system with a heat pump water heater, and the small equipment footprint let a building next door serve as the cooling tower yard. The project won a 2024 ACEC Georgia Engineering Excellence State Award.
Savannah Culinary Institute: Fit nearly 60 linear feet of Type I kitchen hoods, 171.5 tons of cooling and demand-controlled kitchen ventilation into a compact c.1856 building.
Municipal Grand: Mechanical systems for a 44-room hotel in a 1961 concrete bank building, installed throughout the existing structure while keeping its original character.
West Chatham YMCA: Mechanical engineering for a 15,200 SF renovation of a Y that stayed open during construction.
Frequently asked questions
What does a mechanical engineer do on a building project?
A mechanical engineer designs the heating, ventilation and air conditioning (HVAC) systems. That means calculating how much heating and cooling each space needs, choosing and sizing the equipment, laying out ductwork and piping, and coordinating it all with the architect, the structural engineer and the other trades. The engineer also prepares the drawings used for permits and bidding and answers questions during construction. Method designs in Revit so these systems are coordinated in 3D.
What is a water-source VRF system, and when does it make sense?
A VRF (variable refrigerant flow) system uses one outdoor unit to serve many indoor units, with refrigerant flow adjusted for each zone. A water-source VRF system exchanges heat with a water loop instead of outdoor air. The equipment is compact and can move heat from one part of the building to another, which helps where space is tight. At Chatham House Residence Hall, Method paired water-source VRF with a heat pump water heater that turns heat recovered from cooling into domestic hot water, and a building next door served as the cooling tower yard.
How do you fit commercial kitchen ventilation into a historic building?
It takes early coordination between the engineer, architect and kitchen designer on hood locations, exhaust and makeup air routes, and equipment space. At the Savannah Culinary Institute, a four-story masonry building from about 1856, Method fit nearly 60 linear feet of Type I hoods, 171.5 tons of cooling and demand-controlled kitchen ventilation into the structure. Demand-controlled ventilation adjusts exhaust to the cooking load instead of running at full speed all day.
Can you design HVAC for a building that stays open during renovation?
Yes. Method has engineered renovations of occupied buildings, including the West Chatham YMCA in Pooler, Georgia, which stayed open during its 15,200 SF renovation. Phasing, temporary conditions and equipment access are worked out in the design so the owner can keep operating.
Where does Method Engineering Group provide mechanical engineering?
We serve the Southeast from our Savannah, Georgia office at 1020 Drayton Street, Suite 101. Most of our projects are in Georgia and South Carolina.
Service area
Method Engineering Group serves architects, contractors and owners in Georgia and South Carolina, and we are licensed across the Southeast.